Over the 10-month schedule McGraw 8868体育app下载 furnished and installed 450鈥� long by 11鈥� main duct run at an elevation of 70鈥� between the cast house and baghouse facilities; 180 tons of structural steel supports, platforms, and walkways; 650 linear feet of 8 to 11-foot diameter duct, transitions and hoods in the Cast Houses and under the Skip Hoist; and numerous electrical, structural, and pipe relocations.
All of the work was closely coordinated with plant operations and maintenance crews during operating turns, downturns and through a major outage to ensure the project was completed with minimal production interruptions.
PROJECT DETAILS:
- Project Owner:
Private Steel Client - Location:
Southwest Ohio
SERVICES:
- Process Piping
- Structural Steel